Our company provides since 1992 professional energy solutions and services for Sun
& Wind Energy Systems, Downstream & Upstream segments of the Gas & Oil Industry,
Mining Industry, Nuclear Power Plants, Thermoelectric Power Plants, Constructions and government projects. The company has a dedicated team of professionals that are ready
to perform projects under Engineering, Construction, Installation and Commissioning of technical equipment for the Mining Industry, Nuclear Power Plants, Thermoelectric Power Plants, Wind Electricity Converters(WEC), Sun Energy Plants (Photovoltaic Systems) and
Bio Fuel producting units and equipment. TTS is delivering Iodine and HEPA filter systems
to nuclear power plants in EU. We are selling equipment for the mining industry, TTS is undertaking Oil & Gas Procurements.
Our company incorporated in Poland is afiliate of Technical Trading Services SA. TTS SA has been projecting and realizing different energy solutions for the last 23 years. We are planning to construct now up to 100MW wind turbines by 2.35 – 4 KW each in different locations in North-Eastern part of Poland where the weather conditions are best suited
for
the purpose.
Our partners are leading engineering companies in the area as Si Power SA, Eko Energia, Solarvat, etc.
The best offers received for the turbines for the moment are from Enercon GmbH, based in Aurich, Lower Saxony, Germany and Siemens AG, Munich, Germany.
We found the E-92/2.35 MW Gearless type Direct Drive System turbine from Enercon to be the best suited and most eficient for our conditions. It is with variable speed, single blade adjustment with active pitch control.
We have prepared the necessary permissions and licenses from the Polish authorities and this process took almost five years.
We have the complete legal control over the landmark that will be used for the purpose in the respective municipalities and special permission to construct the wind turbines and connect to the grid. This process took about two years.
The project Bolcie 2 Wind Farm is located in the province of Mazury, Poland .
Planned number of wind turbines is 13 pieces, maximum power project 31.5 – 45.5MW. Planned start of construction is the third quarter of 2015.
Project location was chosen due to the favorable environmental conditions, a flat area ( 240m to 260m above sea level) and the lack of large areas of forest. The project area is dominated by agricultural crops with farm buildings located mainly in rural areas. Local authorities and community development are in favor of wind farms, and it was confirmed by the carried out public consultations. Near the project area there are roads that makes it easy to reach and transport the elements of the wind turbines.
Local Development Plan is at an advanced stage of design. Annual environmental monitoring, carried out by local experts showed that the project poses no threat to the environment.
Carried wind campaign made on the basis of annual measurements, mast and SODAR measurements, correlated with long-standing data shows annual wind speed of 7.2 m/s
at 240m . The project is characterized by attractive production of electricity especially for
the new models of wind turbines. |